A genetic algorithm for multi-mode resource constrained project scheduling problem
β Scribed by Masao Mori; Ching Chih Tseng
- Publisher
- Elsevier Science
- Year
- 1997
- Tongue
- English
- Weight
- 540 KB
- Volume
- 100
- Category
- Article
- ISSN
- 0377-2217
No coin nor oath required. For personal study only.
β¦ Synopsis
This article considers a general class of nonpreemptive multi-mode resource-constrained project scheduling problems in which activity durations depend on committed renewable resources (multi-mode time resource tradeoff). We propose a genetic algorithm for these problems and compare it with a stochastic scheduling method proposed by Drexl and Gruenewald. Computational results show that the proposed genetic algorithm is superior to the stochastic scheduling method. ~) 1997 Elsevier Science B.V.
π SIMILAR VOLUMES
A branch and bound algorithm is presented for the resource-constrained project scheduling problem (RCPSP). Given are n activities which have to be processed without preemptions. During the processing period of an activity constant amounts of renewable resources are needed where the available capacit