Present status and future project of KEK-PS
β Scribed by K.H. Tanaka
- Publisher
- Elsevier Science
- Year
- 1986
- Tongue
- English
- Weight
- 176 KB
- Volume
- 450
- Category
- Article
- ISSN
- 0375-9474
No coin nor oath required. For personal study only.
π SIMILAR VOLUMES
CRIEPI initiated the Ogachi project in the northern part of Japan in 1986, to determine the feasibility of an HDR geothermal power plant based on a multi-layer reservoir. During the past eleven years technologies have been developed for surveying underground resources, forming multi-layer reservoirs
The performance of the RNB facility at KEK-Tanashi, which is a pilot facility for the E-arena in the KEK-JAERI joint project, is presented. The muonic X-ray spectroscopy of unstable nuclei by combining the RNB with muon-beam from the M-arena in the joint project is introduced.
Compton scattering is a versatile tool for studying ground state electronic properties. In this review the present state of this technique is described. From an experimental point of view the instrumentation in synchrotron radiation facilities is mainly considered. Comparison between the latest expe
India) tUnic, of Tennessee (USA) Disoriented Chiral Condensates (DCC) have been predicted to form in high energy heavy ion collisions where the approximate chiral symmetry of QCD has been restored. This leads to large imbalances in the production of charged to neutral pions. Sophisticated analysis m