𝔖 Bobbio Scriptorium
✦   LIBER   ✦

Plug's GenCore power for police radio tower


Publisher
Elsevier Science
Year
2007
Tongue
English
Weight
61 KB
Volume
2007
Category
Article
ISSN
1464-2859

No coin nor oath required. For personal study only.

✦ Synopsis


Installed in tandem, the two GenCore units can provide a combined maximum of 10 kW of electric power. The emergency response radio tower requires approximately 7.5 kW. In addition, each fuel cell system has enough stored hydrogen to provide backup power for 72 h without being refueled.

At the Grafton tower, which is on the outer reaches of the statewide network, Plug Power's fuel cell systems will provide the extended run-time needed for continuity of operations during a lengthy grid outage. The continuous availability of the radio system is considered critical to ensuring that the police are able to respond effectively to emergencies and ensure public safety.

The Grafton systems are the last of 22 installations funded by the New York Power Authority as part of a program to deploy fuel cells for backup power at public safety communications facilities across New York state.

The GenCore product line includes backup power products for the telecoms, uninterruptible power supply and electric utility markets. The hydrogen-fueled GenCore 5 kW backup fuel cell system is available in seven configurations to serve the broad requirements of these diverse applications.


πŸ“œ SIMILAR VOLUMES


Plug's GenCore supports remote cell towe
πŸ“‚ Article πŸ“… 2004 πŸ› Elsevier Science 🌐 English βš– 86 KB

Alaska (UAF) and Fairbanks Natural Gas. The system has been able to handle interruptions with the Alaska electricity grid, and the unit continues to operate without detectable deterioration. The project is being led by Dennis Witmer, director of the UAF Arctic Energy Technology Development Laborato

FDT, Plug Power in GenCore distribution
πŸ“‚ Article πŸ“… 2005 πŸ› Elsevier Science 🌐 English βš– 74 KB

For the past 14 months Plug Power has been providing backup power to a remote cell tower in Elgin, Scotland in collaboration with FDT and its customer, the mobile communications company Orange [FCB, May 2004]. The cell site is situated in a forest 450 m above sea level at the Huntly Nordic Ski Cente