𝔖 Bobbio Scriptorium
✦   LIBER   ✦

Object-oriented interaction in resource constrained scheduling

✍ Scribed by Miklós Biró


Publisher
Elsevier Science
Year
1990
Tongue
English
Weight
285 KB
Volume
36
Category
Article
ISSN
0020-0190

No coin nor oath required. For personal study only.


📜 SIMILAR VOLUMES


A new heuristic solution method in resou
✍ Colin E. Bell; Jaemin Han 📂 Article 📅 1991 🏛 John Wiley and Sons 🌐 English ⚖ 979 KB

A new heuristic method is presented for the resolution of multiresource constrained conflicts in project scheduling. In attempting to find a minimal makespan solution, the algorithm employs a simple procedure to generate a feasible solution with no backtracking. A postanalysis phase then applies a h