Heuristics for scheduling resource-constrained projects in MPM networks
β Scribed by Ji Zhan
- Publisher
- Elsevier Science
- Year
- 1994
- Tongue
- English
- Weight
- 1015 KB
- Volume
- 76
- Category
- Article
- ISSN
- 0377-2217
No coin nor oath required. For personal study only.
π SIMILAR VOLUMES
A new heuristic method is presented for the resolution of multiresource constrained conflicts in project scheduling. In attempting to find a minimal makespan solution, the algorithm employs a simple procedure to generate a feasible solution with no backtracking. A postanalysis phase then applies a h
Resource-constrained project scheduling with cash flows occurs in many settings, ranging from research and development to commercial and residential construction. Although efforts have been made to develop efficient optimal procedures to maximize the net present value of cash flows for resource-cons
Resource-constrained project scheduling problems with cash flows (RCPSPCF) are complex, combinatorial optimization problems. Many heuristics have been reported in the literature that produce reasonable schedules in limited project environments. However, the lack of a heuristic that dominates under d