New meta-heuristics for the resource-constrained project scheduling problem

✍ Scribed by Andrew Lim, Hong Ma, Brian Rodrigues, Sun Teck Tan, Fei Xiao


Book ID
118798292
Publisher
Springer US
Year
2011
Tongue
English
Weight
493 KB
Volume
25
Category
Article
ISSN
1936-6582

No coin nor oath required. For personal study only.


πŸ“œ SIMILAR VOLUMES


A new heuristic solution method in resou
✍ Colin E. Bell; Jaemin Han πŸ“‚ Article πŸ“… 1991 πŸ› John Wiley and Sons 🌐 English βš– 979 KB

A new heuristic method is presented for the resolution of multiresource constrained conflicts in project scheduling. In attempting to find a minimal makespan solution, the algorithm employs a simple procedure to generate a feasible solution with no backtracking. A postanalysis phase then applies a h