Minimizing weighted mean absolute deviation of job completion times from their weighted mean
โ Scribed by Erdal Erel; Jay B. Ghosh
- Book ID
- 108052068
- Publisher
- Elsevier Science
- Year
- 2011
- Tongue
- English
- Weight
- 338 KB
- Volume
- 217
- Category
- Article
- ISSN
- 0096-3003
No coin nor oath required. For personal study only.
๐ SIMILAR VOLUMES
We discuss the problem of scheduling several jobs on a single machine with the objective of minimizing the weighted mean absolute deviation of flow times around the weighted mean flow time. We first show that the optimal schedule is W-shaped. For the unweighted case, we show that all optimal schedul
Ohio 43210 We consider a single machine scheduling problem in which the objective is to minimize the mean absolute deviation of job completion times about a common due date. We present an algorithm for determining multiple optimal schedules under restrictive assumptions about the due date. and an im