๐”– Bobbio Scriptorium
โœฆ   LIBER   โœฆ

Minimizing weighted mean absolute deviation of job completion times from their weighted mean

โœ Scribed by Erdal Erel; Jay B. Ghosh


Book ID
108052068
Publisher
Elsevier Science
Year
2011
Tongue
English
Weight
338 KB
Volume
217
Category
Article
ISSN
0096-3003

No coin nor oath required. For personal study only.


๐Ÿ“œ SIMILAR VOLUMES


Minimizing weighted mean absolute deviat
โœ Y. P. Aneja; S. N. Kabadi; A. Nagar ๐Ÿ“‚ Article ๐Ÿ“… 1998 ๐Ÿ› John Wiley and Sons ๐ŸŒ English โš– 94 KB ๐Ÿ‘ 2 views

We discuss the problem of scheduling several jobs on a single machine with the objective of minimizing the weighted mean absolute deviation of flow times around the weighted mean flow time. We first show that the optimal schedule is W-shaped. For the unweighted case, we show that all optimal schedul

Minimizing mean absolute deviation of co
โœ Uttarayan Bagchi; Robert S. Sullivan; Y. L. Chang ๐Ÿ“‚ Article ๐Ÿ“… 1986 ๐Ÿ› John Wiley and Sons ๐ŸŒ English โš– 511 KB

Ohio 43210 We consider a single machine scheduling problem in which the objective is to minimize the mean absolute deviation of job completion times about a common due date. We present an algorithm for determining multiple optimal schedules under restrictive assumptions about the due date. and an im