In this paper, three scheduling problems with deteriorating jobs to minimize the total completion time on a single machine are investigated. By a deteriorating job, we mean that the processing time of the job is a function of its execution start time. The three problems correspond to three different
Minimizing the total weighted completion time of deteriorating jobs
โ Scribed by Aleksander Bachman; Adam Janiak; Mikhail Y. Kovalyov
- Publisher
- Elsevier Science
- Year
- 2002
- Tongue
- English
- Weight
- 53 KB
- Volume
- 81
- Category
- Article
- ISSN
- 0020-0190
No coin nor oath required. For personal study only.
๐ SIMILAR VOLUMES
We study the special case of the m machine flow shop problem in which the processing time of each operation of job j is equal to p H ; this variant of the flow shop problem is known as the proportionate flow shop problem. We show that for any number of machines and for any regular performance criter
We study the minimum total weighted completion time problem on identical machines. We analyze a simple local search heuristic, moving jobs from one machine to another. The local optima can be shown to be approximately optimal with approximation ratio 3 2 . In a special case, the approximation ratio