๐”– Bobbio Scriptorium
โœฆ   LIBER   โœฆ

MINIMISATION OF THE EFFECT OF UNCERTAINTY ON MODEL ESTIMATION

โœ Scribed by U. Prells; A.W. Lees; M.I. Friswell; M.G. Smart


Publisher
Elsevier Science
Year
1998
Tongue
English
Weight
300 KB
Volume
12
Category
Article
ISSN
0888-3270

No coin nor oath required. For personal study only.

โœฆ Synopsis


The objective of this paper is to minimise the effect of an uncertain oil film bearing model on the estimation of a foundation model from run-down measurements on a turbo-generator. To do this a method is presented to identify a dynamic transfer matrix relating the response vector of the foundation at the bearings to an estimated force which is insensitive with respect to the oil film model. Analytically this transfer matrix is related to that of the foundation simply by the multiplication by a transformation matrix which only depends on the model of the rotor and on the model of the oil film, and which of course retains the sensitivity of the original problem with respect to the oil film model. But since the estimation error of the robust transfer matrix estimate is minimum the retained error is mainly due to the erroneous oil film model used in the transformation matrix. The use of the robust estimate to calculate the contribution of the support on the dynamics of the mounted machine for variations of the oil film model increases the reliability of the predictions.


๐Ÿ“œ SIMILAR VOLUMES


On the propagation of uncertainty in wea
โœ Chris. G. Collier ๐Ÿ“‚ Article ๐Ÿ“… 2009 ๐Ÿ› John Wiley and Sons ๐ŸŒ English โš– 149 KB

## Abstract The generation of flow forecasts using rainfall inputs to hydrological models has been developed over many years. Unfortunately, errors in input data to models may vary considerably depending upon the different sources of data such as raingauges, radar and high resolution Numerical Weat

EFFECT OF MODEL STRUCTURE ON THE ACCURAC
โœ M. VAN DER PERK ๐Ÿ“‚ Article ๐Ÿ“… 1997 ๐Ÿ› John Wiley and Sons ๐ŸŒ English โš– 252 KB ๐Ÿ‘ 2 views

Eight one-dimensional steady-state models with dierent complexity, which describe the phosphate concentration as a function of the distance along a river, were examined with respect to accuracy and uncertainty of the model results and identiยฎability of the model parameters by means of combined calib

Uncertainty of AIDS incubation time and
โœ Anna Gigli; Arduino Verdecchia ๐Ÿ“‚ Article ๐Ÿ“… 2000 ๐Ÿ› John Wiley and Sons ๐ŸŒ English โš– 133 KB ๐Ÿ‘ 1 views

Incubation time is the period from the onset of HIV infection to AIDS. The distribution of the incubation time is one of the main parameters of the back-calculation method for the estimation of incidence of HIV infection. Because of the long and variable incubation time, the assessment of its distri