Low-clinker cement for hydraulic structures
β Scribed by E. I. Allilueva; L. M. Deryugin
- Publisher
- Springer
- Year
- 1990
- Tongue
- English
- Weight
- 289 KB
- Volume
- 24
- Category
- Article
- ISSN
- 1570-1468
No coin nor oath required. For personal study only.
π SIMILAR VOLUMES
Cement clinker production is a slow process as raw materials have to be treated at 1350-1450 β’ C. Several modifications to the conventional procedure have been proposed to improve the production process. In this work, we synthesize a Portland belitic clinker from calcite and natural zeolite. The pre
In the examination of alite in Portland cement clinker by transmission electron microscopy, the dominant structure found was that described by Jeffery (I). Twinning on the pseudomirror plane of the monoclinic structure has been found. This provides an explanation for some weak extra X-ray reflection