𝔖 Bobbio Scriptorium
✦   LIBER   ✦

Lead time and response time in a pull production control system

✍ Scribed by Ilhyung Kim; Christopher S. Tang


Book ID
104339346
Publisher
Elsevier Science
Year
1997
Tongue
English
Weight
895 KB
Volume
101
Category
Article
ISSN
0377-2217

No coin nor oath required. For personal study only.

✦ Synopsis


In the late 80s, most manufacturers have shifted their manufacturing strategies from cost and quality to speed. This paper focuses on two performance measures of speed: manufacturing lead time and response time. Manufacturing lead time is the sum of the processing time to convert raw material to finished goods and the waiting time at the buffers. Response time is the time between the customer places an order and the customer receives the order. In this paper we develop a queueing model of a pull-based production control system for a single-stage facility. The intent of the model is two-fold. First, we highlight the trade-off between manufacturing lead time and response time. Second, we develop an optimization model to determine an optimal control system that guarantees certain delivery performance (in terms of response time). (~) 1997 Elsevier Science B.V.


πŸ“œ SIMILAR VOLUMES