𝔖 Bobbio Scriptorium
✦   LIBER   ✦

Adaptive lead time quotation in a pull production system with lead time responsive demand

✍ Scribed by Selçuk, Barış


Book ID
122630358
Publisher
Society of Manufacturing Engineers
Year
2013
Tongue
English
Weight
534 KB
Volume
32
Category
Article
ISSN
0278-6125

No coin nor oath required. For personal study only.


📜 SIMILAR VOLUMES


Lead time and response time in a pull pr
✍ Ilhyung Kim; Christopher S. Tang 📂 Article 📅 1997 🏛 Elsevier Science 🌐 English ⚖ 895 KB

In the late 80s, most manufacturers have shifted their manufacturing strategies from cost and quality to speed. This paper focuses on two performance measures of speed: manufacturing lead time and response time. Manufacturing lead time is the sum of the processing time to convert raw material to fin