𝔖 Bobbio Scriptorium
✦   LIBER   ✦

Jacobs works with Scottish Water on capital program


Publisher
Elsevier Science
Year
2010
Tongue
English
Weight
62 KB
Volume
2010
Category
Article
ISSN
1359-6128

No coin nor oath required. For personal study only.

✦ Synopsis


Alstom to build 2 combined cycle gas units for a power plant in India

A lstom has been awarded two contracts, together worth approximately E450 million, by Indian private utility company GVK Industries, to build two units at the new Jegurupadu III combined cycle power plant in East Godavari District, Andhra Pradesh state, India.

The contracts include an Engineering, Procurement and Construction (EPC) award and an additional long term service agreement.

Under the EPC contract, Alstom will design, manufacture, supply, install, test and commission the two units, each consisting of Alstom's GT26 gas turbine, steam turbine, generator, heat recovery steam generator (HRSG), associated civil works and balance of plant equipment. The gas turbine, steam turbine, generator and HRSG will be manufactured at Alstom's facilities in Europe and Asia. Under the additional long term service agreement, Alstom will assist GVK with post-commissioning maintenance activities at Jegurupadu III.

The two units, to be commissioned from 2013 onwards, will be based on single-shaft configuration and will have a combined power output of 800 MW.


πŸ“œ SIMILAR VOLUMES


Revolutionizing the workplace: A case st
✍ Shilpa Khanna; J. Randolph New πŸ“‚ Article πŸ“… 2008 πŸ› John Wiley and Sons 🌐 English βš– 252 KB

## Abstract Today's workplace designs are being revolutionized due to the changing nature of work and worker profiles, the impact of technology, and the need for organizational efficiency and flexibility. Our case study of the Future of Work (FOW) program at Capital One highlights how thoughtful se

Use of a temperature programmed injector
✍ Mol, Hans G. J. ;Janssen, Hans-Gerd M. ;Cramers, Carel A. ;Brinkman, Udo A. Th. πŸ“‚ Article πŸ“… 1993 πŸ› John Wiley and Sons 🌐 English βš– 525 KB

## Abstract A system is described that allows the introduction of large volumes of water samples in capillary GC. Water elimination is carried out in the solvent split mode in a PTV injector with a packed liner. Two ways of separating water and analytes, __i.e.__ evaporative and non‐evaporative (so