Human aspect in reengineering projects—Conclusions from industrial application
✍ Scribed by Paweł Pawlewski; Witold A. Cempel
- Publisher
- John Wiley and Sons
- Year
- 2010
- Tongue
- English
- Weight
- 379 KB
- Volume
- 21
- Category
- Article
- ISSN
- 1090-8471
No coin nor oath required. For personal study only.
✦ Synopsis
Abstract
The aim of this article is to present the methodology of reengineering projects, taking into consideration the systemic and systematic aspect of human factors so that it constitutes a crucial component of the methodology. The idea of considering this factor stems from investigations connected with the reengineering project that was implemented in a factory producing ship engines. On the one hand, the research resulted in identifying a gap in the reengineering methodology (i.e., not taking simulation into account). On the other hand, an idea appeared to use the simulation as a factor that can prevent or reduce unfavorable reactions and opposition from workers reluctant to accept changes that are an unavoidable effect of a reengineering project. This article presents a literature review on change management, reengineering methodologies, and simulation tools (putting special emphasis on Petri nets). The case study of the implemented project consists of two stages. At the first stage, the methodology of the project was defined, based on the simulation with the use of Petri nets; next, the project was implemented, and, as a conclusion, the need for additional investigations was determined. At the second stage, the scope of the additional research was determined based on Rapid Re methodology; then the investigations were conducted and the suggestions for specific changes in the investigated process were defined. The article ends with general conclusions and suggests changes in the methodology (providing Rapid Re as an example). The authors suggest introducing mechanisms that take into account the human factor based on the simulation technique. The proposed changes give a solid foundation for developing a precise solution for a company, and, as such, they will be the subject of further investigations by the authors. © 2010 Wiley Periodicals, Inc.
📜 SIMILAR VOLUMES
In this paper an attempt is made to develop a methodology for project selection in an Indian coal mining company. The methodology involves the formulation of the project selection problem as a multiple criteria integer linear program and its solution by an interactive method. A case example problem
## Abstract The implementation of a so‐called “Digital Factory” is a tremendous challenge for automotive engineering. The technical task is to effect a seamless information backbone spanning three key departments: Design, Production Process Planning, and Manufacturing. Also suppliers such as machin
In this paper an attempt is made to develop a methodology for project selection in an Indian coal mining company. The methodology involves the formulation of the project selection problem as a multiple criteria integer linear program and its solution by an interactive method. A case example problem