00/03547 Effect of thermochemical treatm
π
Article
π
2000
π
Elsevier Science
β 217 KB
08 Steam raising (boiler operation/design) compatible with the EU, Turow decided to, replace and upgrade six units (l-6) from 200 to 230 MW units and remove one unit 7. Units 8, 9 and 10 were equipped with dry sorbent desulfurization technology. Units 1 and 2 were replaced with new clean coal, circu