Effect of rework strategies on cycle time
โ Scribed by Ali M. Zargar
- Book ID
- 103733191
- Publisher
- Elsevier Science
- Year
- 1995
- Tongue
- English
- Weight
- 341 KB
- Volume
- 29
- Category
- Article
- ISSN
- 0360-8352
No coin nor oath required. For personal study only.
๐ SIMILAR VOLUMES
Integrated procurement-production models offer scope for establishing a link between procurement and production policies when bought-out items are used in production. The model jointly determines economic order sizes for raw materials and economic batch sizes for products. A multistage, multiproduc
Experiments on IS-1020 steel for single tensile overload applied at 12 mm crack length with and without rest time were carried out. The observed retardation effects are presented here and suggested that overload retardation is primarily due to residual compressive stress generated in the crack tip r
In this paper, a simple two-phenotype model with time delay is investigated. The main results are that: (i) the stability of the interior equilibrium point of the pure strategy model not only depends on the property of the payoff matrix but also the effect of time delay; (ii) the conditions of the e