๐”– Bobbio Scriptorium
โœฆ   LIBER   โœฆ

Due-date scheduling on parallel machines with job splitting and sequence-dependent major/minor setup times

โœ Scribed by Taeho Park; Taehyung Lee; Chang Ouk Kim


Publisher
Springer
Year
2011
Tongue
English
Weight
306 KB
Volume
59
Category
Article
ISSN
0268-3768

No coin nor oath required. For personal study only.


๐Ÿ“œ SIMILAR VOLUMES


Scheduling parallel machines with major
โœ Wittrock, RobertJ. ๐Ÿ“‚ Article ๐Ÿ“… 1990 ๐Ÿ› Springer ๐ŸŒ English โš– 706 KB

This article discusses the problem of scheduling a large set of parts on an FMS so as to minimize the total completion time. Here, the FMS consists of a set of parallel identical machines. Setup time is incurred whenever a machine switches from one type of part to another. The setup time may be larg

Scheduling jobs on parallel machines wit
โœ Young Hoon Lee; Michael Pinedo ๐Ÿ“‚ Article ๐Ÿ“… 1997 ๐Ÿ› Elsevier Science ๐ŸŒ English โš– 855 KB

Consider a number of jobs to be processed on a number of identical machines in parallel. A job has a processing time, a weight and a due date. If a job is followed by another job, a setup time independent of the machine is incurred. A three phase heuristic is presented for minimizing the sum of the