This article discusses the problem of scheduling a large set of parts on an FMS so as to minimize the total completion time. Here, the FMS consists of a set of parallel identical machines. Setup time is incurred whenever a machine switches from one type of part to another. The setup time may be larg
โฆ LIBER โฆ
Due-date scheduling on parallel machines with job splitting and sequence-dependent major/minor setup times
โ Scribed by Taeho Park; Taehyung Lee; Chang Ouk Kim
- Publisher
- Springer
- Year
- 2011
- Tongue
- English
- Weight
- 306 KB
- Volume
- 59
- Category
- Article
- ISSN
- 0268-3768
No coin nor oath required. For personal study only.
๐ SIMILAR VOLUMES
Scheduling parallel machines with major
โ
Wittrock, RobertJ.
๐
Article
๐
1990
๐
Springer
๐
English
โ 706 KB
Scheduling on unrelated parallel machine
โ
Jeng-Fung Chen
๐
Article
๐
2009
๐
Springer
๐
English
โ 207 KB
Scheduling jobs on parallel machines wit
โ
Young Hoon Lee; Michael Pinedo
๐
Article
๐
1997
๐
Elsevier Science
๐
English
โ 855 KB
Consider a number of jobs to be processed on a number of identical machines in parallel. A job has a processing time, a weight and a due date. If a job is followed by another job, a setup time independent of the machine is incurred. A three phase heuristic is presented for minimizing the sum of the
Scheduling jobs on dynamic parallel mach
โ
Zne-Jung Lee; Shih-Wei Lin; Kuo-Ching Ying
๐
Article
๐
2009
๐
Springer
๐
English
โ 190 KB
Parallel machine scheduling with release
โ
J.M.J. Schutten; R.A.M. Leussink
๐
Article
๐
1996
๐
Elsevier Science
๐
English
โ 471 KB
Minimization of total tardiness on unrel
โ
Shih-Wei Lin; Chung-Cheng Lu; Kuo-Ching Ying
๐
Article
๐
2010
๐
Springer
๐
English
โ 267 KB