𝔖 Bobbio Scriptorium
✦   LIBER   ✦

Development of 66 kV/6.9 kV 2 MV A prototype HTS power transformer

✍ Scribed by T. Bohno; A. Tomioka; M. Imaizumi; Y. Sanuki; T. Yamamoto; Y. Yasukawa; H. Ono; Y. Yagi; K. Iwadate


Publisher
Elsevier Science
Year
2005
Tongue
English
Weight
685 KB
Volume
426-431
Category
Article
ISSN
0921-4534

No coin nor oath required. For personal study only.


πŸ“œ SIMILAR VOLUMES


China’s 33.5 m, 35 kV/2 k
✍ H.X. Xi; W.Z. Gong; Y. Zhang; Y.F. Bi; H.K. Ding; H. Wen; B. Hou; Y. Xin πŸ“‚ Article πŸ“… 2006 πŸ› Elsevier Science 🌐 English βš– 204 KB

A 33.5 m, 35 kV/2 kA rms , 3 phase, warm dielectric HTS power cable system was successfully installed and connected to the China Southern Power Grid at the Puji substation in Kunming on April 19th of 2004, supplying electricity to 4 industrial customers (including 2 metallurgical refineries) and a r

Design of 154 kV class 100 MVA
✍ J. Choi; S. Lee; M. Park; W. Kim; S. Kim; J. Han; H. Lee; K. Choi πŸ“‚ Article πŸ“… 2007 πŸ› Elsevier Science 🌐 English βš– 695 KB

We have proposed a high temperature superconducting (HTS) transformer which can substitute for a conventional oil transformer for power distribution in Korea. The conventional transformer is composed of three identical single phase transformers because of the limitations on volume and weight. Now th

DC critical current and AC loss measurem
✍ K. Sim; S. Kim; J. Cho; D. Kim; C. Kim; H. Jang; S. Sohn; S. Hwang πŸ“‚ Article πŸ“… 2008 πŸ› Elsevier Science 🌐 English βš– 633 KB

We had designed and manufactured a 22.9 kV/50 MVA class HTS (high temperature superconducting) power cable in cooperation with LS Cable Ltd. The HTS cable system was installed on the testing site of KEPCO (Korea Electric Power Corporation) in Kochang, Korea on March 2007. Some measurements which are

Verification test of 22.9 kV underg
✍ S.H. Sohn; S.D. Hwang; J.H. Lim; S.W. Yim; O.B. Hyun; H.R. Kim; K. Yatsuka; T. M πŸ“‚ Article πŸ“… 2007 πŸ› Elsevier Science 🌐 English βš– 549 KB

Several verification tests are being underway world widely in order to apply HTS cable to real grid. KEPCO (Korea Electric Power Corporation) has initiated HTS cable project since 2002 with the aid of MOCIE (Ministry of Commerce, Industry and Energy), Korea. The HTS cable system with the specificati