China’s 33.5 m, 35 kV/2 kA HTS ac power cable’s operation in power grid

✍ Scribed by H.X. Xi; W.Z. Gong; Y. Zhang; Y.F. Bi; H.K. Ding; H. Wen; B. Hou; Y. Xin


Publisher
Elsevier Science
Year
2006
Tongue
English
Weight
204 KB
Volume
445-448
Category
Article
ISSN
0921-4534

No coin nor oath required. For personal study only.

✦ Synopsis


A 33.5 m, 35 kV/2 kA rms , 3 phase, warm dielectric HTS power cable system was successfully installed and connected to the China Southern Power Grid at the Puji substation in Kunming on April 19th of 2004, supplying electricity to 4 industrial customers (including 2 metallurgical refineries) and a residential population of about 100,000. In this paper, we will report the key technical parameters and update the operation status of the system.