𝔖 Bobbio Scriptorium
✦   LIBER   ✦

Determining production–shipment policy for a vendor–buyer integrated system with rework and an amending multi-delivery schedule

✍ Scribed by Chiu, Singa Wang; Lin, Li-Wen; Chen, Kuang-Ku; Chou, Chung-Li


Book ID
123013147
Publisher
Elsevier Science
Year
2013
Tongue
English
Weight
550 KB
Volume
33
Category
Article
ISSN
0264-9993

No coin nor oath required. For personal study only.


📜 SIMILAR VOLUMES


Determining a threshold control policy f
✍ Ching-Chin Chern; Ping Yang 📂 Article 📅 1999 🏛 John Wiley and Sons 🌐 English ⚖ 675 KB

Consider a threshold control policy for an imperfect production system with only a work center handling both regular and rework jobs. An imperfect production system studied here, generates defect jobs by factors other than machine failures. A threshold control or (, s) policy sets the guideline for