Determining a threshold control policy for an imperfect production system with rework jobs
โ Scribed by Ching-Chin Chern; Ping Yang
- Publisher
- John Wiley and Sons
- Year
- 1999
- Tongue
- English
- Weight
- 675 KB
- Volume
- 46
- Category
- Article
- ISSN
- 0894-069X
No coin nor oath required. For personal study only.
โฆ Synopsis
Consider a threshold control policy for an imperfect production system with only a work center handling both regular and rework jobs. An imperfect production system studied here, generates defect jobs by factors other than machine failures. A threshold control or (, s) policy sets the guideline for a work center to switch between regular and rework jobs. A production cycle begins with loading and processing of several batches of regular jobs with a lot size equal to s. The outcome of each completed regular job is an independent Bernoulli trial with three possibilities: good, rework, or scrap. Once the work center accumulates more than a threshold of rework jobs, it finishes the last batch of regular jobs and switches to rework jobs. The objective of this research is to find a threshold and a lot size s that maximize the average long-term profit. The ultimate goal is to construct a simple algorithm to search for and s that can be implemented directly in production management systems, as a result of this work.
๐ SIMILAR VOLUMES