๐”– Bobbio Scriptorium
โœฆ   LIBER   โœฆ

Cyclic scheduling of a hoist with time window constraints

โœ Scribed by Haoxun Chen, ; Chengbin Chu, ; Proth, J.-M.


Book ID
121204178
Publisher
IEEE
Year
1998
Tongue
English
Weight
305 KB
Volume
14
Category
Article
ISSN
1042-296X

No coin nor oath required. For personal study only.


๐Ÿ“œ SIMILAR VOLUMES


Single-vehicle scheduling with time wind
โœ Gilbert H. Young; Chi-Lok Chan ๐Ÿ“‚ Article ๐Ÿ“… 1999 ๐Ÿ› Springer US ๐ŸŒ English โš– 164 KB

In the single-vehicle scheduling problem with time window constraints, a vehicle has to visit a set of sites on a graph, and each site must be visited after its ready time but no later than its deadline. The goal is to minimize the total time taken to visit all sites. We prove the conjecture propose