After a few false drawns, the Nigerian Liquefied Natural Gas Project is today moving from concept to reality having overcome the preliminary steps of gas reserve estimation, preliminary engineering and demand forecasting. The article provides a concise description of the project structure detailing
Coal gasification as an alternative to natural gas
โ Scribed by A. I. Pavlov
- Book ID
- 111498966
- Publisher
- Allerton Press Inc
- Year
- 2009
- Tongue
- English
- Weight
- 93 KB
- Volume
- 39
- Category
- Article
- ISSN
- 0967-0912
No coin nor oath required. For personal study only.
๐ SIMILAR VOLUMES
03 Gaseous fuels (derived gaseous fuek) non-wetting phase relative permeability was observed in Elgin sandstone (Elgin SS), whereas an increase was observed in Okesa sandstone (Okesa SS) at the same polymer concentration. An attempt was made to determine if these differences are due to the distribu
tonne/y, compared to a maximum single unit capacity of 6000 tonne/y to date. The technology involves the use of a shell-tube catalytic unit that increases both catalysis and the reaction area. The yield is 96%. The technology is 'clean' as reactants are recycled in a closed loop process.