## Abstract We study a deterministic twoβmachine flowshop scheduling problem with an assumption that one of the two machines is not available in a specified time period. This period can be due to a breakdown, preventive maintenance, or processing unfinished jobs from a previous planning horizon. Th
β¦ LIBER β¦
Approximation algorithms for single machine scheduling with one unavailability period
β Scribed by Imed Kacem; Mohamed Haouari
- Publisher
- Springer
- Year
- 2008
- Tongue
- English
- Weight
- 254 KB
- Volume
- 7
- Category
- Article
- ISSN
- 1619-4500
No coin nor oath required. For personal study only.
π SIMILAR VOLUMES
An FPTAS for scheduling a two-machine fl
β
C.T. Ng; Mikhail Y. Kovalyov
π
Article
π
2004
π
John Wiley and Sons
π
English
β 87 KB
Approximation algorithms for scheduling
β
C.N Potts; L.N Van Wassenhove
π
Article
π
1992
π
Elsevier Science
π
English
β 488 KB
An approximation algorithm for schedulin
β
Michel X. Goemans
π
Article
π
1995
π
Elsevier Science
π
English
β 608 KB
Scheduling grouped jobs on single machin
β
Dingwei Wang; Mitsuo Gen; Runwwei Cheng
π
Article
π
1999
π
Elsevier Science
π
English
β 176 KB
Production scheduling of grouped jobs has been an active research area since GT (Group Technology) was widely applied in practical manufacturing systems. To minimize the total Β―owtime of grouped jobs on a single machine, we combine jobs into fundamental runs based upon the necessary condition of the
An efficient algorithm for scheduling jo
β
Wen-Jinn Chen
π
Article
π
2006
π
Springer
π
English
β 183 KB
Makespan minimization for two parallel m
β
Chien-Hung Lin; Ching-Jong Liao
π
Article
π
2006
π
Springer
π
English
β 172 KB