๐”– Bobbio Scriptorium
โœฆ   LIBER   โœฆ

An improved branch-and-bound algorithm for the preemptive open shop total completion time scheduling problem

โœ Scribed by Liaw, Ching-Fang


Book ID
124076564
Publisher
Informa UK (Taylor & Francis)
Year
2013
Tongue
English
Weight
323 KB
Volume
30
Category
Article
ISSN
2168-1015

No coin nor oath required. For personal study only.


๐Ÿ“œ SIMILAR VOLUMES


An efficient branch-and-bound algorithm
โœ Wei-Chang Yeh ๐Ÿ“‚ Article ๐Ÿ“… 2001 ๐Ÿ› Society of Manufacturing Engineers ๐ŸŒ English โš– 826 KB

In this study, the two-machine bicriteria flowshop scheduling problem is addressed. The objective is to minimize a weighted sum of total flowtime and makespan. Different branch-and-bound algorithms have already appeared in the literature for this problem. In this study, a more efficient branch-and-b