Scheduling deteriorating jobs is an area of research which has attracted much attention recently. In this paper the problem of single machine scheduling, where the values of jobs remaining after processing deteriorate over time, is presented. A branch and bound method is developed, which, using the
A branch-and-bound and heuristic algorithm for the single-machine time-dependent scheduling problem
โ Scribed by Wen-Chiung Lee; Yu Shin Lin; Chin-Chia Wu
- Publisher
- Springer
- Year
- 2009
- Tongue
- English
- Weight
- 151 KB
- Volume
- 47
- Category
- Article
- ISSN
- 0268-3768
No coin nor oath required. For personal study only.
๐ SIMILAR VOLUMES
In this study, the two-machine bicriteria flowshop scheduling problem is addressed. The objective is to minimize a weighted sum of total flowtime and makespan. Different branch-and-bound algorithms have already appeared in the literature for this problem. In this study, a more efficient branch-and-b
A branch and bound algorithm is presented for the resource-constrained project scheduling problem (RCPSP). Given are n activities which have to be processed without preemptions. During the processing period of an activity constant amounts of renewable resources are needed where the available capacit