A stochastic permutation-flowshop scheduling problem minimizing in distribution the schedule length
β Scribed by I Adiri; E Frostig
- Publisher
- Elsevier Science
- Year
- 1984
- Tongue
- English
- Weight
- 148 KB
- Volume
- 3
- Category
- Article
- ISSN
- 0167-6377
No coin nor oath required. For personal study only.
π SIMILAR VOLUMES
In this paper we consider a practical scheduling problem commonly arising from batch production in a flexible manufacturing environment. Different part-types are to be produced in a flexible manufacturing cell organized into a two-stage production line. The jobs are processed in batches on the first
A problem of scheduling jobs on parallel, identical machines under an additional continuous resource to minimize the makespan is considered. Jobs are non-preemtable and independent and all are available at the start of the process. The total amount of the continuous resource available at a time is l