๐”– Bobbio Scriptorium
โœฆ   LIBER   โœฆ

A new heuristic for open shop total completion time problem

โœ Scribed by Lixin Tang; Danyu Bai


Book ID
108057036
Publisher
Elsevier Science
Year
2010
Tongue
English
Weight
377 KB
Volume
34
Category
Article
ISSN
0307-904X

No coin nor oath required. For personal study only.


๐Ÿ“œ SIMILAR VOLUMES


Classical and new heuristics for the ope
โœ Christelle Guรฉret; Christian Prins ๐Ÿ“‚ Article ๐Ÿ“… 1998 ๐Ÿ› Elsevier Science ๐ŸŒ English โš– 111 KB

We study the problem of constructing minimum makespan schedules for the Open-Shop problem. This paper presents two new heuristics: the ยฎrst one is a list scheduling algorithm with two priorities. The second is based on the construction of matchings in a bipartite graph. We develop several versions o