๐”– Bobbio Scriptorium
โœฆ   LIBER   โœฆ

A mathematical model for the multi-mode resource-constrained project scheduling problem with mode dependent time lags

โœ Scribed by Majid Sabzehparvar; S. Mohammad Seyed-Hosseini


Publisher
Springer US
Year
2007
Tongue
English
Weight
426 KB
Volume
44
Category
Article
ISSN
0920-8542

No coin nor oath required. For personal study only.


๐Ÿ“œ SIMILAR VOLUMES


A genetic algorithm for multi-mode resou
โœ Masao Mori; Ching Chih Tseng ๐Ÿ“‚ Article ๐Ÿ“… 1997 ๐Ÿ› Elsevier Science ๐ŸŒ English โš– 540 KB

This article considers a general class of nonpreemptive multi-mode resource-constrained project scheduling problems in which activity durations depend on committed renewable resources (multi-mode time resource tradeoff). We propose a genetic algorithm for these problems and compare it with a stochas