A new heuristic solution method in resou
β
Colin E. Bell; Jaemin Han
π
Article
π
1991
π
John Wiley and Sons
π
English
β 979 KB
A new heuristic method is presented for the resolution of multiresource constrained conflicts in project scheduling. In attempting to find a minimal makespan solution, the algorithm employs a simple procedure to generate a feasible solution with no backtracking. A postanalysis phase then applies a h