will produce 54 054 m 3 per day of treated water, which will be used for injection to pressurise the oil reservoir. The delivery is scheduled for 2012.
Veolia selected for 2 UAE wastewater plants
- Publisher
- Elsevier Science
- Year
- 2008
- Tongue
- English
- Weight
- 58 KB
- Volume
- 2008
- Category
- Article
- ISSN
- 1359-6128
No coin nor oath required. For personal study only.
โฆ Synopsis
Fluor secures 2 Valero hydrocracker projects U nder contracts worth US$1.2 bil- lion with Valero Energy Corp, Fluor Corp is to provide engineering, procurement, construction and construction management services for Valero's Unified Hydrocracker (HCU) Program projects at its St Charles, Louisiana and Port Arthur, Texas refineries in the USA.
The two projects are part of a major growth program for Valero at its St Charles and Port Arthur refineries. The two refineries have been designed to capitalise on the production of ultra-low sulfur diesel transportation fuels through the addition of two hydrocrackers.
Fluor is currently executing the engineering, procurement, and construction work for three other hydrocracker projects in the US.
๐ SIMILAR VOLUMES