๐”– Bobbio Scriptorium
โœฆ   LIBER   โœฆ

Use of the Danube river and the integrated Gabcikovo-Nagymaros hydro development project

โœ Scribed by Yu. S. Vasil'ev; G. A. Pretro


Publisher
Springer
Year
1989
Tongue
English
Weight
499 KB
Volume
23
Category
Article
ISSN
1570-1468

No coin nor oath required. For personal study only.


๐Ÿ“œ SIMILAR VOLUMES


River rehabilitation from the hydrogeomo
โœ Erskine, Wayne D. ;Terrazzolo, N. ;Warner, R.F. ๐Ÿ“‚ Article ๐Ÿ“… 1999 ๐Ÿ› John Wiley and Sons ๐ŸŒ English โš– 576 KB

Large interbasin water transfers for hydro-electric power generation have substantially changed the hydrology of the Snowy River below the Snowy Mountains Hydro-Electric Scheme in southeastern Australia, since 1967. Annual, monthly, mean daily and peak instantaneous flows have been significantly red

Catchment stream surveys and the use of
โœ A.D. Webb; P.J. Bacon; M. Naura ๐Ÿ“‚ Article ๐Ÿ“… 1998 ๐Ÿ› John Wiley and Sons ๐ŸŒ English โš– 321 KB ๐Ÿ‘ 1 views

A field survey of stream and river habitats at a sample of sites was undertaken in the Scottish Dee catchment in 1995 based on the River Habitat Survey (RHS) method, as part of a partnership catchment management project. 2. The selection of survey sites was based on a stratified random sample accor