𝔖 Bobbio Scriptorium
✦   LIBER   ✦

Two machine openshop scheduling with machine-dependent processing times

✍ Scribed by Asoo J. Vakharia; Bülent Çatay


Publisher
Elsevier Science
Year
1997
Tongue
English
Weight
408 KB
Volume
73
Category
Article
ISSN
0166-218X

No coin nor oath required. For personal study only.

✦ Synopsis


In a recent paper, Dror (1992) presented several results for openshop scheduling with machine dependent processing times. In this note, we present clarifications regarding the algorithm developed by him for minimizing the sum of job completion times (or average flow time) in a 2 machine openshop and show that it is not optimal for all cases. Finally, we present an optimal algorithm for the same 2 machine openshop problem.


📜 SIMILAR VOLUMES