๐”– Bobbio Scriptorium
โœฆ   LIBER   โœฆ

Two-machine flow shop scheduling of polyurethane foam production

โœ Scribed by Lin, Bertrand M.T.; Lin, Y.-Y.; Fang, K.-T.


Book ID
122916316
Publisher
Elsevier Science
Year
2013
Tongue
English
Weight
294 KB
Volume
141
Category
Article
ISSN
0925-5273

No coin nor oath required. For personal study only.


๐Ÿ“œ SIMILAR VOLUMES


Scheduling groups of jobs in the two-mac
โœ K.R Baker ๐Ÿ“‚ Article ๐Ÿ“… 1990 ๐Ÿ› Elsevier Science ๐ŸŒ English โš– 618 KB

This paper provides a review of the two-machine flow shop model when time lags or setups are introduced. Building on these results, it establishes a general framework for scheduling groups of jobs when each group requires a setup.