An efficient branch-and-bound algorithm
โ
Wei-Chang Yeh
๐
Article
๐
2001
๐
Society of Manufacturing Engineers
๐
English
โ 826 KB
In this study, the two-machine bicriteria flowshop scheduling problem is addressed. The objective is to minimize a weighted sum of total flowtime and makespan. Different branch-and-bound algorithms have already appeared in the literature for this problem. In this study, a more efficient branch-and-b