Production of radioisotopes in the BR2 h
✍
Bernard Ponsard
📂
Article
📅
2007
🏛
John Wiley and Sons
🌐
French
⚖ 414 KB
👁 1 views
## Abstract The BR2 reactor, put into operation in 1963 and refurbished in 1995–1997, is a 100 MW high‐flux ‘materials testing reactor’ which provides thermal neutron fluxes up to 10^15^ n/cm^2^ s. The production of radioisotopes, characterized by high specific activities, is carried out in dedicat