Total completion time minimization in two-machine job shops with unit-time operations
β Scribed by Wieslaw Kubiak; Vadim Timkovsky
- Publisher
- Elsevier Science
- Year
- 1996
- Tongue
- English
- Weight
- 802 KB
- Volume
- 94
- Category
- Article
- ISSN
- 0377-2217
No coin nor oath required. For personal study only.
π SIMILAR VOLUMES
We study the special case of the m machine flow shop problem in which the processing time of each operation of job j is equal to p H ; this variant of the flow shop problem is known as the proportionate flow shop problem. We show that for any number of machines and for any regular performance criter
## Abstract Consider two machines, labeled 1 and 2. A set of tasks has to be processed first on machine 1 and after that on machine 2. A second set of tasks has to be processed first on machine 2 and after that on machine 1. All the processing times are exponentially distributed. We present a polic