๐”– Bobbio Scriptorium
โœฆ   LIBER   โœฆ

Throughput and Delay Analysis of IEEE 802.15.6-based CSMA/CA Protocol

โœ Scribed by Sana Ullah, Min Chen, Kyung Sup Kwak


Book ID
118803164
Publisher
Springer US
Year
2012
Tongue
English
Weight
863 KB
Volume
36
Category
Article
ISSN
0148-5598

No coin nor oath required. For personal study only.


๐Ÿ“œ SIMILAR VOLUMES


Analysis of CSMA/CA in IEEE 802.15.4
โœ Wang, F.; Li, D.; Zhao, Y. ๐Ÿ“‚ Article ๐Ÿ“… 2011 ๐Ÿ› The Institution of Engineering and Technology ๐ŸŒ English โš– 573 KB
Throughput and Delay Analysis of Unslott
โœ Latrรฉ, Benoรฎt; Mil, Pieter De; Moerman, Ingrid; Dhoedt, Bart; Demeester, Piet; D ๐Ÿ“‚ Article ๐Ÿ“… 2006 ๐Ÿ› Academy Publisher, Finland ๐ŸŒ English โš– 492 KB
CSMA/CA performance under high traffic c
โœ Eustathia Ziouva; Theodore Antonakopoulos ๐Ÿ“‚ Article ๐Ÿ“… 2002 ๐Ÿ› Elsevier Science ๐ŸŒ English โš– 793 KB

The IEEE802.11 standard for wireless local area networks is based on the CSMA/CA protocol for supporting asynchronous data transfers. CSMA/CA uses an acknowledgment mechanism for verifying successful transmissions and optionally, a handshaking mechanism for decreasing collisions overhead. In both ca