The time spent in a dynamic job shop
β Scribed by J.G. Shanthikumar; J.A. Buzacott
- Publisher
- Elsevier Science
- Year
- 1984
- Tongue
- English
- Weight
- 612 KB
- Volume
- 17
- Category
- Article
- ISSN
- 0377-2217
No coin nor oath required. For personal study only.
π SIMILAR VOLUMES
In the process of hierarchical production planning lot Sizing has to be done m a med',am time horizon From that point of view, in ajob shop environment the production time and material flow can be regarded as stochastic Using results of Queuing Theory for lot sizing, the average throughput time can
## Abstract Consider two machines, labeled 1 and 2. A set of tasks has to be processed first on machine 1 and after that on machine 2. A second set of tasks has to be processed first on machine 2 and after that on machine 1. All the processing times are exponentially distributed. We present a polic