๐”– Bobbio Scriptorium
โœฆ   LIBER   โœฆ

The structural design and installation of the whole unit hoising of 1800 ton steel structure of Beijing West Railway Station

โœ Scribed by Lu Kekuan


Publisher
Elsevier Science
Year
1998
Tongue
English
Weight
54 KB
Volume
46
Category
Article
ISSN
0143-974X

No coin nor oath required. For personal study only.

โœฆ Synopsis


This paper presents the design and installation quality control of the 1800 ton weight steel structure hoisting process of Beijing West Railway Station Project. The peripheral total volume of the main steel structure is 25 287 m. By employing a synchronous hydraulic jack, the lifting distance reaches 43.42, 20% of cost discount compared with upper air bulk installation; 45 m long steel frame structure is designed with prestress technology; the steel expenditure is cut at the rate of 20%. The total cost of production is US$2 800 000.


๐Ÿ“œ SIMILAR VOLUMES