𝔖 Bobbio Scriptorium
✦   LIBER   ✦

The stochastic U-line balancing problem

✍ Scribed by Franco Guerriero; John Miltenburg


Publisher
John Wiley and Sons
Year
2003
Tongue
English
Weight
219 KB
Volume
50
Category
Article
ISSN
0894-069X

No coin nor oath required. For personal study only.


πŸ“œ SIMILAR VOLUMES


A heuristic network procedure for the as
✍ Peter A. Pinto; David G. Dannenbring; Basheer M. Khumawala πŸ“‚ Article πŸ“… 1978 πŸ› John Wiley and Sons 🌐 English βš– 417 KB

## Abstract Proposed is a Heuristic Network (HN) Procedure for balancing assembly lines. The procedure uses simple heuristic rules to generate a network which is then traversed using a shortest route algorithm to obtain a heuristic solution. The advantages of the HN Procedure are: a) it generally y

The load-distance balancing problem
✍ Edward Bortnikov; Samir Khuller; Jian Li; Yishay Mansour; Joseph Seffi Naor πŸ“‚ Article πŸ“… 2011 πŸ› John Wiley and Sons 🌐 English βš– 133 KB

## Abstract Problems dealing with assignment of clients to servers have been widely studied. However, they usually do not model the fact that the delay incurred by a client is a function of both the distance to the assigned server and the load on this server, under a given assignment. We study a pr

The stochastic single resource service-p
✍ Shane Dye; Leen Stougie; Asgeir Tomasgard πŸ“‚ Article πŸ“… 2003 πŸ› John Wiley and Sons 🌐 English βš– 162 KB

## Abstract The service‐provision problem described in this paper comes from an application of distributed processing in telecommunications networks. The objective is to maximize a service provider's profit from offering computational‐based services to customers. The service provider has limited ca

A balancing problem for mixed model asse
✍ Xiaobo Zhao; Katsuhisa Ohno; Hon-Shiang Lau πŸ“‚ Article πŸ“… 2004 πŸ› John Wiley and Sons 🌐 English βš– 155 KB

## Abstract We state a balancing problem for mixed model assembly lines with a paced moving conveyor as: Given the daily assembling sequence of the models, the tasks of each model, the precedence relations among the tasks, and the operations parameters of the assembly line, assign the tasks of the