Production sequencing problem with reent
โ
Hark Hwang; Ji Ung Sun
๐
Article
๐
1997
๐
Elsevier Science
๐
English
โ 241 KB
This paper addresses a shop scheduling problem for the side flame press shop in a truck manufacturing company. In the problem, a set ofn jobs to be scheduled on two machines. All the jobs require processing by the first machine more than once in their operation sequences with reentrant work flows. A