The S-DALINAC facility — Operational experience from the accelerator and the experimental installations
✍ Scribed by J. Auerhammer; H. Genz; H.-D. Gräf; R. Hahn; P. Hoffmann-Stascheck; C. Lüttge; U. Nething; K. Rühl; A. Richter; T. Rietdorf; P. Schardt; E. Spamer; F. Thomas; O. Titze; J. Töpper; H. Weise
- Publisher
- Elsevier Science
- Year
- 1993
- Tongue
- English
- Weight
- 248 KB
- Volume
- 553
- Category
- Article
- ISSN
- 0375-9474
No coin nor oath required. For personal study only.
📜 SIMILAR VOLUMES
Building-integrated PV started receiving attention in the Netherlands around 1990. Attention has ever since been focusing on the integration of PV into new dwellings. Efforts have resulted in cost reductions, performance improvements, the development of new integration products and the creation of a
Cryogenics at liquid helium temperature has been requested in the SPS for testing and operating superconducting accelerating RF cavities: in 1988 and 1989 a single LEP prototype cavity made of bulk niobium, in 1990 two cavities made of niobium sputtered copper and finally, in 1991, a single niobium