Large complicated projects with interdependent activities can be described by project networks. Arcs represent activities, nodes represent events, and the network's structure defines the relation between activities and events. A schedule associates an occurrence time with each event: the project can
โฆ LIBER โฆ
The payment scheduling problem
โ Scribed by Richard C. Grinold
- Publisher
- John Wiley and Sons
- Year
- 1972
- Tongue
- English
- Weight
- 548 KB
- Volume
- 19
- Category
- Article
- ISSN
- 0894-069X
No coin nor oath required. For personal study only.
๐ SIMILAR VOLUMES
The payment scheduling problem
โ
Richard C. Grinold
๐
Article
๐
1972
๐
John Wiley and Sons
๐
English
โ 548 KB
Client Perspective Based Multimode Proje
โ
Zheng-wen HE; Ren-jing LIU; Xin-bu HU; Yu XU
๐
Article
๐
2009
๐
Elsevier
โ 256 KB
The poset scheduling problem
โ
Gerard J. Chang; Jack Edmonds
๐
Article
๐
1985
๐
Springer Netherlands
๐
English
โ 303 KB
The Loading Time Scheduling Problem
โ
Randeep Bhatia; Samir Khuller; Joseph (Seffi) Naor
๐
Article
๐
2000
๐
Elsevier Science
๐
English
โ 226 KB
In this paper we study precedence constrained scheduling problems, where the tasks can only be executed on a specified subset of the set of machines. Each machine has a loading time that is incurred only for the first task that is scheduled on the machine in a particular run. This basic scheduling p
The cyclic separation scheduling problem
โ
Ronald D. Armstrong; Prabhakant Sinha
๐
Article
๐
1977
๐
John Wiley and Sons
๐
English
โ 594 KB
The mixed shop scheduling problem
โ
Teruo Masuda; Hiroaki Ishii; Toshio Nishida
๐
Article
๐
1985
๐
Elsevier Science
๐
English
โ 540 KB