𝔖 Bobbio Scriptorium
✦   LIBER   ✦

The influence of alternate process planning in job shop scheduling

✍ Scribed by Juichin Jiang; Ming-ying Chen


Publisher
Elsevier Science
Year
1993
Tongue
English
Weight
260 KB
Volume
25
Category
Article
ISSN
0360-8352

No coin nor oath required. For personal study only.


πŸ“œ SIMILAR VOLUMES


Scheduling groups of jobs in the two-mac
✍ K.R Baker πŸ“‚ Article πŸ“… 1990 πŸ› Elsevier Science 🌐 English βš– 618 KB

This paper provides a review of the two-machine flow shop model when time lags or setups are introduced. Building on these results, it establishes a general framework for scheduling groups of jobs when each group requires a setup.

A scheduling problem in a semi-open job
✍ A.S. Alfa; K.L. Dolhun; C.-L. Li πŸ“‚ Article πŸ“… 1994 πŸ› Elsevier Science 🌐 English βš– 606 KB

consider the scheduling of a cordset manufacturing process through several operations. The department is a semi-open job shop. The first and last operations are defined, but the remaining operations can be sequenced in a semi-flexible manner. We present a mixed-integer programming formulation of thi