๐”– Bobbio Scriptorium
โœฆ   LIBER   โœฆ

The environmental aspects of a tidal power project in the upper reaches of the Bay of Fundy

โœ Scribed by Donald C. Gordon Jr.; Alan R. Longhurst


Book ID
118943617
Publisher
Elsevier Science
Year
1979
Tongue
English
Weight
950 KB
Volume
10
Category
Article
ISSN
0025-326X

No coin nor oath required. For personal study only.


๐Ÿ“œ SIMILAR VOLUMES


Simulation of the tidal propagation in t
โœ V. Argintaru; D.H. Willis ๐Ÿ“‚ Article ๐Ÿ“… 1984 ๐Ÿ› Elsevier Science ๐ŸŒ English โš– 465 KB

A new method, called hybrid modelling was developed, which dynamically couples physical and mathematical models of various regions of an estuary. The method is used to predict possible changes the development for tidal power would have on the Bay of Fundy/Gulf of Naine existing tides. Fundy Tidal Po