𝔖 Bobbio Scriptorium
✦   LIBER   ✦

The effect of quality and reserves uncertainty to production scheduling of a lignite mine feeding a power plant

✍ Scribed by Michael Galetakis; Christos Roumpos


Book ID
113885189
Publisher
Elsevier
Year
2010
Tongue
English
Weight
150 KB
Volume
2
Category
Article
ISSN
1877-0428

No coin nor oath required. For personal study only.


πŸ“œ SIMILAR VOLUMES


Determination of the effect of roof pres
✍ Niyazi Bilim; Δ°hsan Γ–zkan πŸ“‚ Article πŸ“… 2008 πŸ› Elsevier Science 🌐 English βš– 847 KB

Mechanized longwall mines require a systematic excavation schedule to control roof stress. Excavation sometimes becomes easier when the cutting cycle is interrupted and the face is subjected to in-situ strain, because the excavation machine may perform more efficiently. However, under those circumst