๐”– Bobbio Scriptorium
โœฆ   LIBER   โœฆ

The development and evaluation of a cost-based composite scheduling rule

โœ Scribed by Sumer C. Aggarwal; Bruce A. McCarl


Publisher
John Wiley and Sons
Year
1974
Tongue
English
Weight
776 KB
Volume
21
Category
Article
ISSN
0894-069X

No coin nor oath required. For personal study only.


๐Ÿ“œ SIMILAR VOLUMES


Development of a distributed cooperative
โœ Takahiro Kawamura; Naoki Kase; Dai Araki; Akihiko Osuga ๐Ÿ“‚ Article ๐Ÿ“… 2000 ๐Ÿ› John Wiley and Sons ๐ŸŒ English โš– 391 KB ๐Ÿ‘ 1 views

Using a single concentrated scheduling system in a large-scale manufacturing system is problematic. As a result, scheduling systems are being introduced in departmental units, which has resulted in having to repeat schedule adjustments between departments whenever there is a change in one department

Development and evaluation of a novel bi
โœ S. K. Gupta; M. R. Kurup; E. Devadoss; Rm. Muthiah; S. Thomas ๐Ÿ“‚ Article ๐Ÿ“… 1985 ๐Ÿ› John Wiley and Sons ๐ŸŒ English โš– 657 KB

Hydroxyl terminated natural rubber (HTNR) was prepared by the depolymerization of masticated natural rubber in the presence of HZ02 in toluene. Probable mechanisms leading t~ the formation of side reaction products are proposed based on the analytical data. A comparative study of some formulation va

Evaluation of the marginal outage costs
โœ R. Ghajar; R. Billinton ๐Ÿ“‚ Article ๐Ÿ“… 1994 ๐Ÿ› Elsevier Science ๐ŸŒ English โš– 630 KB

Evaluation of the marginal outage costs in generation systems using quantitative power system reliability techniques has been recently demonstrated. It was shown that the marginal outage cost varies with the operating reserve and the lead time into the future. This paper is concerned with the variat