The development and evaluation of a cost-based composite scheduling rule
โ Scribed by Sumer C. Aggarwal; Bruce A. McCarl
- Publisher
- John Wiley and Sons
- Year
- 1974
- Tongue
- English
- Weight
- 776 KB
- Volume
- 21
- Category
- Article
- ISSN
- 0894-069X
No coin nor oath required. For personal study only.
๐ SIMILAR VOLUMES
Using a single concentrated scheduling system in a large-scale manufacturing system is problematic. As a result, scheduling systems are being introduced in departmental units, which has resulted in having to repeat schedule adjustments between departments whenever there is a change in one department
Hydroxyl terminated natural rubber (HTNR) was prepared by the depolymerization of masticated natural rubber in the presence of HZ02 in toluene. Probable mechanisms leading t~ the formation of side reaction products are proposed based on the analytical data. A comparative study of some formulation va
Evaluation of the marginal outage costs in generation systems using quantitative power system reliability techniques has been recently demonstrated. It was shown that the marginal outage cost varies with the operating reserve and the lead time into the future. This paper is concerned with the variat