𝔖 Bobbio Scriptorium
✦   LIBER   ✦

The critical path to growth

✍ Scribed by Charles Goodeve


Publisher
Springer US
Year
1974
Tongue
English
Weight
399 KB
Volume
5
Category
Article
ISSN
0032-2687

No coin nor oath required. For personal study only.


πŸ“œ SIMILAR VOLUMES


Using critical path analysis to model mu
✍ CHRIS BABER; BRIAN MELLOR πŸ“‚ Article πŸ“… 2001 πŸ› Elsevier Science 🌐 English βš– 345 KB

In this paper, the concept of multimodal human-computer interaction is explored. It is proposed that multimodality can be de"ned from human or technology perspectives, which place emphasis on di!erent attributes of the system. Furthermore, in this paper it is argued that the most e!ective de"nition

Tracing the equilibrium path beyond comp
✍ Reijo Kouhia; Martti Mikkola πŸ“‚ Article πŸ“… 1999 πŸ› John Wiley and Sons 🌐 English βš– 226 KB

Procedures to handle critical points with coincident or nearly coincident buckling loads in a geometrically nonlinear continuation process are presented. The proposed branch switching algorithm is based on a Liapunov-Schmidt-Koiter-type asymptotic reduction which is used for the prediction step into