𝔖 Bobbio Scriptorium
✦   LIBER   ✦

The basic data set project for GARP planning

✍ Scribed by T. Thompson


Publisher
John Wiley and Sons
Year
1971
Tongue
English
Weight
241 KB
Volume
97
Category
Article
ISSN
0035-9009

No coin nor oath required. For personal study only.


πŸ“œ SIMILAR VOLUMES


Sampling Plan for the Brazilian TACO Pro
✍ Maria Antonia Martins Galeazzi; Dag MendonΓ§a Lima; Fernando A.B. Colugnati; Rena πŸ“‚ Article πŸ“… 2002 πŸ› Elsevier Science 🌐 English βš– 131 KB

The TACO project (Brazilian Table of Food Composition), sponsored by the Brazilian Ministry of Health and executed by NEPA-UNICAMP (Center for Studies and Research on FoodsFState University of Campinas), is generating new data on the most consumed foods in Brazil, based on a national sampling plan a

Innovative resettlement schemes planned
✍ Mikiyasu Nakayama πŸ“‚ Article πŸ“… 2003 πŸ› John Wiley and Sons 🌐 English βš– 112 KB

## Abstract The Numata Dam, planned for the Tone River basin of Gunma Prefecture, was the largest dam construction project ever considered in Japan. This dam construction project, however, did not materialize. The proposal for the Numata Dam was first launched in 1959, at a time when the Tokyo Metr